TTC – Sheppard West Station

OZZ Electric is part of the team that is responsible for the overall construction of the TTC Sheppard West Project. Key elements of the project included extensive pre-work with the layout drawings, TTC required coordination drawings, interference drawings and addition onsite coordination drawings. The electrical construction included the Installation of owner supplied high voltage switchgear, the supply and install of a double ended 2000 amp switchgear, one UPS, the conduit and wiring for Passenger intercom system, Security, Access Control and CCTV and a complete Fire Alarm System.