Woodstock Solar

In Woodstock, the multi-level photovoltaic roof installation was part of the FIT program. There are over 2400 solar modules installed on this building, making this a 555 kilowatt system feeding into the local grid. Wolfedale Electric, a division of OZZ Electric completed this project on budget and on schedule. This system includes a proactive communication with the local hydro distribution to allow for warning signals when the system is not running at its optimum production.

Our project and field management teams understand the importance of hitting milestones and keeping projects on track. They also understand the importance of safety. When working on roofing structures, there are always detailed rooftop safety plans to ensure safety of the site when hoisting, working on the roof, and on the ground near the facility.

Toronto South Detention Centre

The Toronto South Detention Centre was a design build finance and maintenance project.  This project is approximately 896,000 square feet building was a new construction of a maximum security facility which included:

  • 1650 beds for male inmates
  • An additional 320 beds to accommodate those serving primarily weekend sentences
  • Infirmary
  • Food and laundry facility
  • Mental health assessment unit
  • Special needs unit
  • Aboriginal healing area
  • General population areas
  • Administration areas
  • Administrative segregation unit

 

Square One

Square One Shopping Mall is one of the largest shopping malls in Ontario. This latest investment totaled approximately $84 million encompassing a major renovation to the common areas, food court and shopper amenities.

OZZ Electric was responsible for high end LED lighting throughout this section of the mall, special LED cove lighting throughout the Centre Walk (upper & lower levels), the supply and installation of a brand new advanced LUTRON low voltage lighting control system, and the installation of a VESDA system for fire alarm.

TTC – Sheppard West Station

OZZ Electric is part of the team that is responsible for the overall construction of the TTC Sheppard West Project. Key elements of the project included extensive pre-work with the layout drawings, TTC required coordination drawings, interference drawings and addition onsite coordination drawings. The electrical construction included the Installation of owner supplied high voltage switchgear, the supply and install of a double ended 2000 amp switchgear, one UPS, the conduit and wiring for Passenger intercom system, Security, Access Control and CCTV and a complete Fire Alarm System.